1m4 Appointment planner
Ring binder planner with 15-minute intervals
€8.95*
Available now | Delivery between 30/12/2025 – 02/01/2026
Appointment planner by 1m4
With this flexible and clearly structured A4 appointment planner without date entries, you can always keep track of your appointments. Its durable metal spiral binding makes it especially durable, while its smart time division in 15-minute intervals from 7 AM to 9 PM provides space for up to six appointments per block. This planner is ideal for annual scheduling without being tied to a fixed calendar. Be it for your practice, office, or home – this appointment planner makes organization easier and brings structure into each day.
Product details
- A4 appointment planner without date entries
- With sturdy metal spiral binding
- Space for up to 3 appointments per page or 6 appointments per double page
- Time division: 15-minute intervals (7 AM to 9 PM)
- Contents: 104 pages / 52 sheets
- Material: paper, steel, polypropylene (PE)
- Dimensions: 21 x 29.7 x 1 cm
- Weight: 300 g
Package contents
- 1 1m4 appointment planner
Product identification
| Product number | 103943.0 |
|---|---|
| Manufacturer name | 1m4 |
| Manufacturer item no. | 10046.00 |
| EAN | 4745010564611 |
1 review
Alyssa
26 November 2025
Sehr guter Terminplaner. Die Metallspirale läuft deutlich sauberer und hakt nicht wie bei Planern mit Kunststoffspirale.



